Our Factory

10,000 m² factory.

Building A2, Zone 4, Jiantou Holding Group Science & Technology Park, Ganzhou Electronic Information Industrial Park, Longnan Economic & Technological Development Zone, Longnan, Ganzhou, Jiangxi, China (former Youxinpu Zone A plant)

About Us
Our factory building in Longnan, Ganzhou, Jiangxi, China
Capability

From chip to harness — 13 in-house steps.

Raw material in, tested assemblies out — nothing is outsourced.

Incoming NTC chips and lead wire
01

Raw material

Dicing wafers into thermistor chips
02

Wafer dicing

Forming and stabilising each chip
03

Chip forming

Cutting lead wire to the drawing length
04

Lead cutting

Automated material cutting on the line
05

Automated cutting

Operators screening out defective chips
06

Manual screening

Chips and leads fixed in a forming fixture
07

Fixture forming

Automated tinning of the solder joint
08

Automated tinning

Enamel coating over the chip
09

Enamel coating

Final inspection of the finished thermistor
10

Final inspection

Dedicated cutting machine for each wire type
11

Machine per wire type

Crimping terminals to the drawing
12

Crimping to drawing

Custom build to customer requirements
13

Built to your drawing

We develop our own NTC thermistor chips. Focused on NTC thermistors. Custom automotive harnesses.

Quality

Shipment yield 100%

Every wire is made with care.

Crimping terminals onto wire harnesses
  • Chip value5K to 100K Ω, matched to your B value and tolerance
  • Lead wireEnamel, PVC, PTFE, silicone or fibreglass
  • LengthCut, stripped and tinned to your drawing
  • TerminationCrimped terminals, moulded bead or metal housing
  • Packaging & labelsYour label template, barcodes and carton marks
Factory Footage

NTC Chips & Thermistors, Automotive Harnesses

Send us your drawing — get a quote in 12 hours

WhatsAppOpen chat